Bengaluru’s Pink Line metro stretch dedicated as PM launches projects worth over ₹15,600 crore
The Friday programme also covered four rebuilt railway stations, a Vande Bharat to Goa and power lines for solar and wind zones.

Prime Minister Narendra Modi dedicated Bengaluru Metro’s Pink Line to the nation on Friday 13 November 2026, the Prime Minister’s Office said. It was part of a set of projects in Karnataka worth over ₹15,600 crore that he inaugurated, dedicated or laid foundation stones for.
The PMO’s note before the visit described the Pink Line stretch as Kalena Agrahara to Tavarekere, costing about ₹3,470 crore. The stretch is 7.5 km long and elevated, news agency PTI reported. It has six stations, Oneindia and Sunday Guardian reported: Kalena Agrahara, Hulimavu, IIMB, JP Nagar 4th Phase, Jayadeva Hospital and Tavarekere. The PMO’s schedule listed a metro ride for the Prime Minister from Tavarekere to the IIM Bangalore station.
The Prime Minister said Bengaluru’s metro network has grown from 17 km in 2014 to over 100 km, making it the third Indian city region to cross 100 km after Delhi-NCR and Mumbai. Trade publication Construction World put the change at 96.1 km before the opening and 103.6 km after it. The PMO release quotes him as saying the success of Namma Metro, as the city’s metro is called, “is the result of the country’s new thinking”.
The new stretch is the first part of a longer line. A further 13.7 km underground section will take the Pink Line north to Nagawara, PTI reported. Until then, passengers can change at Jayadeva station to the line that runs to Electronic City. Karnataka minister Krishna Byre Gowda, who gave these details at a press conference on 11 November, said of that link: “If this were only a 7.5-kilometre standalone line, perhaps it would not be as effective.”
For commuters, the PMO release says the corridor will improve travel to IIM Bengaluru, other educational institutions and business and technology hubs. Gowda said public services would start at 6 am on Saturday 14 November, with a train every eight minutes at first, PTI reported. Five trains have been allotted, four in service and one on standby. He said fares had not been decided at that point. “This is a long-awaited moment for Bengaluru residents,” PTI quoted him as saying.
On rail, the list has four redeveloped stations (Chamarajanagar, Chikkamagaluru, Sakleshpur and Subrahmanya Road), a 45 km doubled section between Bagalkot and Wandal, and electrification of the 55 km Sakleshpur to Subrahmanya Road ghat section. Doubling means laying a second track beside a single line. The PMO note says the whole Bengaluru to Mangaluru route is now electrified. A Bengaluru-Mangaluru-Madgaon Vande Bharat Express was flagged off. The note lists its stops as Hassan, Sakleshpur, Mangaluru, Udupi, Murdeshwar, Gokarna, Karwar and Madgaon. The release says Karnataka’s railway allocation has grown ninefold over the past 10 to 12 years.
The list also has power transmission schemes for renewable energy zones at Koppal, Gadag and Bidar. The note puts the Koppal and Gadag scheme at about ₹4,450 crore and the Bidar scheme at about ₹1,370 crore. There is an underground LPG storage cavern of 80,000 tonnes at Mangaluru, which the note calls India’s largest and prices at over ₹850 crore. A foundation stone was laid for a GAIL biogas plant at Haralakunte that will process about 300 tonnes of city waste a day. Foundation stones were also laid for transmission schemes in Davanagere, Chitradurga and Ballari.
On what comes next, Gowda said the gap between trains may be cut once the signalling settles and demand is clear, PTI reported. “First, the signalling has to improve,” he said. The remaining underground section is targeted for 2027, Sunday Guardian reported.
The PMO releases do not say when the Pink Line opens to paying passengers or what the fares are. NewsKhata has not seen a notice from Bangalore Metro Rail Corporation confirming that trains ran on Saturday, the final fare table or first and last train times. Oneindia reported fares of roughly ₹10 to ₹30 without naming a source.
Get the day's best stories on WhatsApp. Free, a few a day, no spam.
Follow on WhatsAppSource ledger · स्रोत खाता
Each fact in this story, where it came from, and how it was checked.
| Fact | Source | Check |
|---|---|---|
| Event on 13 Nov; over ₹15,600 crore; Pink Line dedicated; metro network figures; Vande Bharat | Prime Minister’s Office | Confirmed, official source |
| Stretch name and cost; stations; rail sections; energy and gas projects | Prime Minister’s Office, advance note | Confirmed, official source |
| Stretch is 7.5 km, elevated; remaining 13.7 km underground section to Nagawara; interchange at Jayadeva with Electronic City line | PTI via The Week (minister Krishna Byre Gowda, 11 Nov 2026) | Single source |
| Six stations: Kalena Agrahara, Hulimavu, IIMB, JP Nagar 4th Phase, Jayadeva Hospital, Tavarekere | Oneindia; Sunday Guardian | Confirmed, independent outlets |
| PM schedule: metro ride from Tavarekere to IIM Bangalore station | Prime Minister’s Office, advance note | Confirmed, official source |
| Network 96.1 km before, 103.6 km after | Construction World | Single source |
| PM quote: success of Namma Metro ‘is the result of the country’s new thinking’; corridor improves connectivity to IIM Bengaluru, educational institutions, business and tech hubs; ninefold rise in Karnataka railway allocation over 10 to 12 years | Prime Minister’s Office | Confirmed, official source |
| Public services from 6 am on 14 Nov; train every 8 minutes; five trains (four in service, one standby); fares not decided as of 11 Nov; Gowda quotes | PTI via The Week | Single source |
| Vande Bharat stops: Hassan, Sakleshpur, Mangaluru, Udupi, Murdeshwar, Gokarna, Karwar, Madgaon | Prime Minister’s Office, advance note | Confirmed, official source |
| Koppal-II and Gadag-II scheme about ₹4,450 crore; Bidar scheme about ₹1,370 crore; LPG cavern over ₹850 crore and called India’s largest; foundation stones for Davanagere/Chitradurga and Ballari transmission schemes | Prime Minister’s Office, advance note | Confirmed, official source |
| Remaining underground section targeted for 2027 | Sunday Guardian | Single source |
| Fares roughly ₹10 to ₹30 (no source named) | Oneindia | Single source |
Corrections to this story: none.